Masterflex Peristaltic Feed Pump
PM-204Head pressure above ceilingFeed pump on Skid BR-UP-01 (2,000L Fed-Batch Bioreactor). Live readings from the historian, maintenance history from Maximo and spare stock from SAP — all read-only.
Operating state
Last 1-min average · red tick = hard limit
Head pressure
1.48bar
Ceiling 1.20 bar
Tubing life expended
412/ 500 h
OEM life 400–500 h
Motor speed
184.2RPM
OEM tubing limit ≤ 200
1.48 bar vs 1.20 bar ceiling · delivered feed −14.2% at constant 184.2 RPM
Tubing hours come from the CMMS run-hour counter reset at WO-8726; the tube has run across MES-26072 and MES-26073.
Asset record
- Tag
- PM-204
- Model
- Masterflex L/S
- Pump head
- Easy-Load II
- Tubing
- Size 24 Pt-silicone
- Tubing lot
- TS24-PT-5521
- Clamp torque
- 0.55 N·m
- Pressure TX
- PT-204 · cal. Oct 3
- Governing SOP
- SOP-UP-014 Rev 7
Correlated anomaly timeline
Head pressure (left axis) with MES-26073 delivered feed (right axis, dashed)
Head pressure (PM-204) (bar)— Feed rate MES-26073 (mL/min, right axis)
R² = 0.941 feed loss vs head pressure — correlation across 3 batches, not causal proof
Maximo work order ledger
PM-204 · last 30 days and scheduled
| Work order | Date (UTC) | Type | Description | Status | Source |
|---|---|---|---|---|---|
| Oct 26 06:00 (sched.) | CIP/SIP | BR-UP-01 feed skid CIP/SIP incl. PM-204 line, 06:00–14:00 Overlaps MES-26074 inoculation by 4.5 h · resolve | Scheduled | ||
| Oct 23 (planned) | Corrective | Tubing changeout + dynamic slip verification per SOP-UP-014 §7.2 | Awaiting approval | ||
| Oct 17 07:12 | Corrective | Occlusion clamp torque 0.42 → 0.55 N·m after audible chatter. Returned to service. Dynamic slip verification not performed (fixture unavailable) | Closed | ||
| Oct 3 13:20 | Calibration | PT-204 discharge pressure transmitter · as-found +0.3% FS (tol. ±0.5%) | Closed · pass | ||
| Sep 26 20:05 | Preventive | Scheduled tubing changeout · lot TS24-PT-5521 · gravimetric check −0.1% | Closed · pass |
Spare parts availability
SAP stock · read-only extract
- 6
Tubing · size 24 platinum silicone
96440-24 · Suite 3B airlock cabinet SB-3B-02
Gamma-irradiated · lot TS24-PT-5604 · exp. Apr 2027 · cleanroom-ready
- 14
Tubing · size 24 platinum silicone
96440-24 · Central warehouse WH-C-14
Needs transfer and wipe-down into Grade B
- 1
L/S Easy-Load II pump head
77200-62 · Maintenance crib MC-01
Not cleanroom-ready; transfer takes ~2 h
- 0
Pressure transmitter PT-204 spare
PT-204-SP · —
None in stock · lead time 10 days
Proposed maintenance action
Drafted from INV-104 evidence · requires maintenance and QA sign-off
- Rationale
- Tubing is inside the OEM end-of-life window, the clamp was tightened without the SOP-required slip check, and delivery fell at constant RPM.
- Expected result
- Head pressure back below 1.20 bar and delivered feed within ±3% of setpoint at 184 RPM after changeout and verification.
- Constraints
- Can only run when BR-UP-01 is not in a GMP batch. Planned for the Fri 23 Oct CIP turnaround; the Mon 26 Oct 06:00–14:00 sanitization window already conflicts with MES-26074 inoculation; 6 cleanroom-ready tubes are available in the Suite 3B airlock.
- Owner
- K. Daniels (Maintenance) · Marcus Bell (Cleanroom Supervisor)
- Required approval
- Maintenance planner approval of WO-8848 in Maximo and QA concurrence under Q-DEV-031.
- Would change this proposal
- A slip test on the removed tube showing normal delivery (points away from tubing), or a PT-204 check showing the pressure reading is biased.